Intel AXXRSBBU3 Datasheet Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 13
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
iv Intel
®
RAID Smart Battery Installation Guide
WARNINGS
Server power on/off: The push-button on/off power switch on the front
panel of the server does not turn off the AC power. To remove AC power
from the server, you must unplug the AC power cord from either the power
supply or wall outlet.
Hazardous conditions—power supply: Hazardous voltage, current, and
energy levels are present inside the power supply enclosure. There are no
user-serviceable parts inside it; servicing should only be done by technically
qualified personnel.
Hazardous conditions—devices and cables: Hazardous electrical
conditions may be present on power, telephone, and communication cables.
Turn off the server and disconnect telecommunications systems, networks,
modems, and the power cord attached to the server before opening it.
Otherwise, personal injury or equipment damage can result.
Page view 3
1 2 3 4 5 6 7 8 9 ... 12 13

Comments to this Manuals

No comments